Summary of Solution AUS00C02.SNX =================================== J Steed, G Johnston, J Dawson, B Twilley, P Digney ---------------------------------------------------- Geodesy Program, Australian Surveying and Land Information Group (AUSLIG). This solution, made available to the IERS by AUSLIG for the ITRF2000 submission, was produced using as a combination of terrestrial observations and GPS baselines for the determination of the Local Tie at the Hobart VLBI station. The terrestrial observations were undertaken using A Lieca TC2000 Total Station. The GPS observations were prossessed using the BERNESE Version 4.0 software and IGS products. The terrestrial observations and GPS results were combined and adjusted using the GEOLAB 2.4d adjustment software. The solution has been constrained to ITRF1997 at 1997.0 at the HOB2 (Domes 50116M004) station. Orientation for the network has been provided by the GPS baselines. The observations were taken in February 1995. These results are the basis for the new local tie at this site.